After thirty years on the same address with increasingly limited space, DSV needed new facilities in Odense. The solution was a new office building attached to a warehouse 10.000 m2 big resulting in a six doubling of the number of pallet spaces.
The elegant black office building houses 70 workstations and is directly attached to the warehouse, but shifted slightly towards the entrance. This makes it express its respective functions.
The warehouse follows the elegant design featured on DSV projects with vertical elements in different silver shades. With a wide variety of gates and ramps, the warehouse building offers flexibility to its users.